AFS
AFS U-Surf Stabiliser
AFS U-Surf Stabiliser
Couldn't load pickup availability
Description
AFS U-Surf Stabiliser — Grip & Trust
In surf foiling, everything happens in the turn — rail-to-rail, the pressure under your feet, the exact moment you decide to press or release. The U-Surf was born from a search to precisely optimise those key moments where tolerance, flawless control and grip are essential.
Designed as the counterpart to the U-Carve, it keeps the "surf performance" DNA while delivering more grip and confidence in powerful turns and technical water. Initially developed to extend the Silk V2's usable range, it multiplies its potential in surf foiling: more lateral grip, more support underfoot, and a more precise read of trajectories.
A progressive grip
The secret is a series of bumps on the leading edge — an innovative design inspired by natural wings — that changes how water flows around the profile. The result: it softens the stall and delivers progressive, predictable grip. A stabiliser that inspires confidence and lets you engage powerfully without surprises.
Why choose U-Surf
- More tolerant — smooths out angle mistakes and imperfect re-accelerations
- More grip through turns for a strong, reassuring commitment
- Progressive stall thanks to the leading-edge "bump" design
- Confident feel even in rough conditions
- Smooth and precise — true to the "U Series" spirit
Specs
| Size | Surface | Span | Aspect Ratio | Max chord | Max thickness | Construction |
|---|---|---|---|---|---|---|
| U-Surf 120 | 120 cm² | 328 mm | 9 | 50 mm | 5 mm | HR Carbon + HM Carbon (Monolithic) |
| U-Surf 135 | Scaled outline — more lift, slightly more glide | |||||
| U-Surf 150 | Larger surface, balanced for lighter wind / smaller wave conditions | |||||
About AFS
Designed and manufactured at AFS's factory in Brittany, France. Pre-preg carbon, 2-year warranty.
Delivery from Môr Watersports
The 150 is currently in stock at the AFS factory — typical UK delivery ~5 days from order. The 120 and 135 are produced to order — typical lead time around 2 weeks. Get in touch and we'll confirm timing for your build.